The Project consists generally of the following major items:
NC·
ncotherNew
Solicitation
274-ES-FO-FY26-MordecaiHVACReplacement-R
NAICS
238220
Organization
CITY OF RALEIGH
Posted
Sep 9, 2025
Response due
—
Set-aside
None
Type
IFB
Classification / PSC
J041
Documents & attachments
Description
The Project consists generally of the following major items:
Base Bid: Mordecai House
• Replace 12-tons of existing split system heat pump equipment.
• Remove existing humidifiers and replace with 2 steam humidification
systems.
• Provide pre-construction and post-construction test and balance.
• Control via local thermostat/humidistat.
Add Alternate #1: Mordecai House Duct Work
• Replace existing ductwork in Mordecai House basement with new.
Add Alternate #2: Post Office
• Remove existing 2-ton packaged heat pump and associated ductwork in crawl space.
• Provide two new ductless floor mounted fan coils on one heat pump.
• Provide post-construction test and balance.
• Control via local thermostat.
Add Alternate #3: Andrew Johnson house
• Remove existing 2.5-ton split system heat pump equipment.
• Provide post-construction test and balance.
• Control via local thermostat.
Add Alternate #4: Old Office
• Replace existing 2.5-ton split system heat pump equipment.
• Provide post-construction test and balance.
• Control via local thermostat.
Special Instructions: Contact: Tommy.Mangum@raleighnc.gov

