Harmon Tunnel Highwall (Bluff) Scaling, Pammel State Park, Madison County

US-IA
IA·ia
otherNew

Solicitation

26-04-61-02

NAICS

237990

Organization

Natural Resources, Dept Of

Posted

Jun 11, 2026

Response due

Jun 25, 202613 days left

Type

Request for Bids

Point of contact

Name
Darin Galbraith
Title
Procurement Specialist
Email
constructionbids@dnr.iowa.gov
Phone
(515) 344-0055

Description

"This work includes the removal of loose or potentially unstable disjointed spalled/ exfoliated bedrock fragments and talus above/ around both tunnel portal highwalls (within the zone of influence as depicted in the Drawings) by manual, mechanical or chemical (non-explosive) methods. Includes removal and disposal of all spoil resulting from the highwall scaling operation and all loose material located in the area between the 'zone of influence' and the tunnel pavement. Blasting is not permitted. Each rock slope scaling foreman and all personnel conducting work or activities related to scaling operations shall have performed satisfactory work on three similar projects within the last five years. All personnel must have a minimum of two years of full-time experience in rock slope stabilization that includes rock scaling." Please see the plans and bid package as noted below. Bid Closing Date and Time: 6/25/2026 at 3:00 PM. Bids must be submitted electronically as directed in the General Information and Instructions to Bidders.
Harmon Tunnel Highwall (Bluff) Scaling, Pammel State Park, Madison County | IA | Vourix · Vourix