Gremista Landfill, Lerwick, Shetland - Phase 3 Construction
UK Find a Tender
ocds-h6vhtk-06c7ba · United Kingdom · New
- Organization
- Shetland Islands Council
- Posted
- Jul 9, 2026
- Response due
- Aug 19, 2026 · 36 days left
Description
The Gremista Landfill, Lerwick Phase 3 extension will primarily involve cut and fill earthworks, new haul roads, installing new surface water drainage ditches, pipework, manholes, and headwalls; placing a 500mm bentonite-enriched soil layer over the new landfill formation surface; followed by a 2mm HDPE welded geomembrane basal liner, protection geotextile, leachate collection pipework, and 500mm thick, clean aggregate drainage / protection layer. Capping works to the existing Phase 2 landfill area are also included and will comprise 1mm thick LLDPE welded geomembrane and restoration soils.