City of Cornelia Raw Water Reservoir No. 1 Improvements

US-GA
GA·ga
otherNew

Solicitation

PE-66850-NONST-2026-000000018

NAICS

237110

Organization

Cornelia, City Of

Posted

May 20, 2026

Response due

Jun 23, 202613 days left

Set-aside

None

Type

IFB

Classification / PSC

Y1PZ

Point of contact

Name
Patricia Riceprice@cartersloope.com706-769-4119
Email
price@cartersloope.com

Documents & attachments

Description

Sealed bids for construction of the City of Cornelia Raw Water Reservoir No. 1 Improvements will be received until the closing time of June 23, 2026, at 2:00 PM local time. Bids must be submitted by the Bidder electronically through QuestCDN.com. No paper submissions will be accepted. Any bid received after the bid closing time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically provided in the Instructions to Bidders and/or by State law. Base Cost of all Bids will be posted by the Owner/Engineer to the QuestCDN website within approximately 30 minutes after the bid closing time. A non-mandatory Pre-bid conference will be held on June 4, 2026, at 2:00 PM local time onsite. The approximate address is 1282 Camp Creek Road, Cornelia, GA 30531. The coordinates to the access road are 34.5349, -83.5104. It will be a gravel road on the right, approximately 1,000 feet past Lakeview Heights Circle as you are driving north on Camp Creek Road. The purpose is to allow bidders access to the jobsite and discuss any other questions the bidder may have. Bringing a small boat to access the outlet control structure is recommended. Engineer will transmit to all prospective Bidders of Record such addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. The Work shall consist of furnishing all labor, materials, and equipment necessary to perform the work as specified, generally described as follows: installation of new toe drains, modifications to outlet control structure, catwalk to outlet control structure, concrete retaining wall construction, demolition of raw water tower, and miscellaneous site piping. Time allotted for completion of work ...please see Supporting Documents for complete information.
City of Cornelia Raw Water Reservoir No. 1 Improvements | GA | Vourix · Vourix