CIP-2305 Parris Island (PI) 16-inch Steel Water Transmission Main Replacement (Malecon Drive)
SC·
scotherNew
Solicitation
2026-IFB-019
NAICS
None
Organization
Beaufort - Jasper Water & Sewer Authority
Posted
Feb 3, 2026
Response due
—
Description
Phase I: Installation of approximately 12,200 linear feet of 16-inch Polyethylene liner inside of an existing 16-inch steel waterline and other related required for complete installation. Phase II: Installation of approximately 1,625 linear feet of 16-inch fusible PVC installed by horizontal directional drill (HDD) on both sides of Archer Creek Bridge

