Access Control System at Jackson County Jail
GA·
gaotherNew
Solicitation
PE-67800-NONST-2026-000000042
NAICS
561621
Organization
Jackson County Board Of Commissioners
Posted
Apr 23, 2026
Response due
Jul 2, 202622 days left
Set-aside
None
Type
IFB
Classification / PSC
5616
Documents & attachments
Description
Jail Access Control
System Functional Requirements
The proposed system shall be capable of monitoring, controlling, and integrating the following components:
¿ Swing Doors (345)
¿ DPS Monitoring Points (56)
¿ Gate Control Points (3)
¿ Sliding Doors (11)
¿ Intercom Stations (428)
¿ Paging Zones (33)
¿ IP Camera Integration via RTSP (130) ¿ County standard: Avigilon
¿ Panic Alarm Inputs (22)
¿ Watch Tour Monitoring Points (29)
¿ Card Readers (25) ¿ County standard: Avigilon
¿ Lighting Control
¿ Television (TV) Control
System Components and Infrastructure Requirements
The following components are anticipated to be required as part of the proposed solution. Equivalent alternatives must be approved by the County prior to submission:
¿ Workstations: Dell workstations with 27¿ Dell monitors and APC UPS battery backup, fully integrated with the County¿s existing EcoStruxure IT monitoring environment, for security system operations
¿ Server Infrastructure: Dell rack-mounted server with APC UPS, fully integrated into the existing EcoStruxure IT environment, supporting both server and network switching infrastructure
¿ Relay Control Modules: Three (3) modules to interface with and control existing relays to remain in service
¿ System Exchanges: Fifteen (15) units
¿ Intercom Master Stations: Thirteen (13) units
¿ Low Voltage Power Supplies: Ten (10) units
Card Access Control System
¿ Enclosures: Three (3)
¿ Card Readers: Twenty-five (25)
¿ Controller Boards (¿Main System Boards¿): Three (3)
¿ Expansion Modules: Nineteen (19)
¿ Access Control Server: One (1)
Documentation and Deliverables
The selected firm shall provide the following:
¿ Complete shop drawings
¿ Equipment layout drawings
¿ Device termination drawings
¿ Comprehensive training for County staff and system administrators
¿ All shipping and freight costs to the project site
Please note Addendum 2 that expands scope

