2026 LMIG/LRA ROAD IMPROVEMENTS

US-GA
GA·ga
otherNew

Solicitation

PE-77082-NONST-2026-000000006

NAICS

237310

Organization

LMIG/LRA ROAD IMPROVEMENTS

Posted

May 13, 2026

Response due

Jun 15, 20265 days left

Set-aside

None

Type

IFB

Classification / PSC

Y1LB

Point of contact

Name
Brent Davisbrent@reliableeng.net229-224-3299
Email
brent@reliableeng.net

Documents & attachments

Description

This Project will repair and resurface approximately 10.7 miles on 7 roads in Mitchell County including County Line Road from the Thomas/Grady line to S.R. 93 (4.45 Miles), Orr Road from Forty-Niner Road to Old Pelham Camilla Road (1.64 Miles), Goodson Road from Harney Street to U.S. 19 (1.17 Miles), Mt, Zion Church Road from U.S. 19 to Mount Zion Road (3.16 Miles), Cut Road from S.R. 112 to S.R. 93 (0.28 Miles), patch a section on Delta Pine Road, and patch a section on Stage Coach Road. The scope generally consists of 2,170 TONS of Road Patching by milling existing road and replacing with 3-6¿ of 19 mm Superpave Asphalt, 5,670 TONS of leveling, 38,870 SY of Double Chip and Sand Seal Surface Treatment, and 6,263 TONS of Asphalt Resurfacing. Project also includes traffic control, shoulder clipping, tack coat, primer, striping, shoulder restoration along with any other related accessories and appurtenances as shown on the Drawings and called for in the Contract Documents.
2026 LMIG/LRA ROAD IMPROVEMENTS | GA | Vourix · Vourix